Skip to content

Building w.s. – Side walls contd.

September 30, 2017

With the days getting shorter and winter knocking on the door soon, the focus of the workshop project has moved from actual building to preserving the unused materials. The entire family worked on moving several packages of materials from the yard into the workshop building. This time we moved the support boards for the indoor ceiling panels and the remaining wind-roofing boards into safety.

The remaining time I spent on continuing with the side walls. I cut the beams and built the frame for the windows.

I also attached the spacer boards on top of the wind-proofing boards which are supposed to let the air float behind the wooden panels and the wind-proofing boards.

Overall, this strengthens the structure of the side wall giving us better chances to get dry through the winter…

But when will winter come…?

Advertisements
No comments yet

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: