Work camp – Day 1

April 26, 2011
by

I’ll be now for 6 days hammering and screwing about Villa Linnea instead of being in the office in order to move things forward for the summer. My goal is to get the floor in the bedroom installed including the floorheating.

After setting up base camp I installed the floor support structure already earlier.

I managed to install the first 20cm of insulation (the bloody stuff made from recycled glas) and put the electricity cables in place for the sockets on the floor level.

Well, and I managed to paint the logs of the second floor with a protective tansparent primer. but one doesn’t seen anything of this work, so no picture.

Advertisements
No comments yet

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: